Course Project: AT272 Lab 11 Final Assembly

I. Intro

Date: 11/20/2023

On this day, we did the final assembly.

II. Procedure

Figure 1: Frame is ready
Figure 2: put on the adhesives.
Figure 3: secure with clecos
Figure 4: use iron bar to make better contact between the surfaces of the wing spar and top and bottom wing skins. This place had a shortage on iron bars.
Figure 5: ready to cure

Date: 12/04/2023

On this day, we cleaned the lab and got our grades.

Figure 6: building tower
Figure 7: the tallest ever had
Figure 8: done

Leave a Reply

Your email address will not be published. Required fields are marked *